International Patent for Precision Lifting of Industrial Plant Equipment Foundations: Millimeter-Level Integrated U-Shaped Underpinning and Reinforcement Without Production Shutdown

Estimated read time 6 min read

The international patent held by Beijing Hengxiang Hongye Foundation Reinforcement Technology Co., Ltd., titled A Precision Lifting Method and Lifting Reinforcement Structure for Industrial Plant Equipment Foundations (United States, Application No. PCT/CN2020/107608), adopts an integrated three-in-one technical framework consisting of curtain wall isolation, U-shaped reinforcement body underpinning, and retreating segmented precision lifting.

This technology achieves overall, non-destructive, millimeter-level precision restoration of heavy-duty industrial plant equipment foundations while simultaneously reinforcing the ground, fundamentally addressing the risks associated with differential settlement in industrial facilities.

I. Industry Challenges: Three Major Construction Difficulties Caused by Settlement in Heavy-Duty Industrial Plants

Floor settlement in large industrial plants is a common challenge across industries involving heavy precision equipment, including photovoltaics, steel and metallurgy, and home appliance manufacturing. Individual core production machines in these facilities can weigh hundreds of tons, while plant backfill soil layers may reach several dozen meters in thickness. Even after dynamic compaction treatment, soil layers may continue to undergo consolidation under their own weight. Combined with long-term equipment loads, this can easily result in significant additional deformation.

Uneven floor settlement can cause precision equipment to shift out of alignment, substantially increasing calibration costs and, in severe cases, directly interrupting production.

9f96d71f8725b83399148046e000569b

Traditional repair methods face three seemingly irreconcilable challenges:

  1. Heavy-duty industrial plants cannot afford production shutdowns or equipment relocation.

  2. Production lines are densely arranged, and construction disturbances may trigger chain reactions of settlement in surrounding soil.

  3. Thick backfill layers often have insufficient compaction and low foundation bearing capacity, making conventional reinforcement methods less effective.

This patented technology was specifically developed to address these challenges. It can achieve precision lifting of industrial floors covering tens of thousands of square meters, together with foundation reinforcement, while strictly controlling construction disturbances.

II. Core Patented Technology: An Integrated Three-in-One Precision Lifting and Reinforcement System

The international patent held by Hengxiang Hongye, A Precision Lifting Method and Lifting Reinforcement Structure for Industrial Plant Equipment Foundations (United States, Application No. PCT/CN2020/107608), establishes an integrated technical framework combining an isolated construction zone, overall underpinning, and precision lifting.

1. Curtain Wall Isolation

Two parallel curtain walls are constructed by vertically drilling holes along both sides of the floor construction area. These walls effectively isolate the construction influence zone from the surrounding soil.

2. U-Shaped Reinforcement Body Underpinning

Inclined downward grouting holes are arranged along the curtain walls. Specialized composite materials are injected beneath the floor slab and between the two curtain walls, solidifying into a U-shaped reinforcement body. An internal steel reinforcement framework is incorporated to prevent the floor slab from cracking or bulging under upward pressure.

3. Retreating Segmented Precision Lifting

Lifting holes are drilled beneath the reinforcement body, followed by retreating segmented grouting operations. Combined with a visual intelligent monitoring system, grouting pressure and lifting height are adjusted in real time, achieving millimeter-level elevation control.

674a700e7126fef8d75ce30a9f8914b0

III. Key Advantages of the Patented Technology

1. Curtain Wall Isolation Achieves Zero Disturbance to Surrounding Areas

The dual curtain walls form an enclosed vibration-isolation structure. Grouting disturbances and grout diffusion are confined within the construction cavity, minimizing impacts on surrounding operating equipment and existing foundations.

2. Integrated U-Shaped Underpinning Protects Floor Slab Integrity

The U-shaped structure, combined with an internal steel reinforcement framework, evenly distributes the loads from heavy equipment. This eliminates localized stress concentration and fundamentally prevents floor slab arching, cracking, and bulging.

3. Simultaneous Reinforcement and Lifting Significantly Shorten Construction Time

Curtain wall water and vibration isolation, soil reinforcement, and floor lifting are carried out simultaneously. This eliminates the need for separate construction stages and significantly reduces on-site construction time.

IV. Application Case: Floor Settlement Reinforcement Project at Haier Central Air Conditioning Plant in Shandong

The Haier Central Air Conditioning plant in Shandong is a light steel structure industrial facility supported by independent pile foundations. The site primarily consists of plain fill and miscellaneous fill soil.

Due to differential settlement of the foundation soil under varying loads and groundwater erosion, the pile-end bearing layer, consisting of fractured soft rock, experienced reduced bearing capacity after water softening.

A total of 21 pile foundations experienced differential settlement, with the maximum settlement reaching 240 mm. This caused deformation of equipment foundations and interior floors, seriously affecting the normal operation of production equipment.

The project adopted this patented construction technology combined with non-destructive and controllable soil solidification technology.

27d1c677780fc5a4ab3b4bb477df3b54

Curtain walls were installed around the construction area to isolate construction disturbances. Grouting reinforcement was performed on equipment foundations, interior floors, and backfill soil beneath the pile foundations to form an integrated U-shaped underpinning reinforcement body.

Subsequently, retreating segmented precision lifting was implemented, with an intelligent monitoring system dynamically adjusting elevations to achieve foundation leveling and restoration.

Throughout the construction process, the plant maintained normal production operations.

After reinforcement, the foundation leveling deviation was controlled within ±10 mm, with a cumulative lifting height of 240 mm. The entire construction period lasted 20 days. The bearing capacity of the foundation was effectively improved, and no secondary settlement occurred after project completion.

Client Feedback:

"Hengxiang Hongye's construction solution was professional and reliable. The treatment results exceeded our expectations and provided stable support for the continuous operation of our production lines."

V. Corporate Innovation and International Intellectual Property Strength

Hengxiang Hongye's core technology in high-rise building lifting and rectification has been evaluated by the Ministry of Science and Technology as having an "Overall Internationally Advanced Level, with Certain Aspects Reaching an Internationally Leading Level" (Certification No. 202311ZK7875).

The company is an industry-academia-research cooperation partner of China University of Geosciences (Beijing) and China University of Mining and Technology (Beijing).

It has established one corporate standard and accumulated 148 domestic and international patent applications and granted patents, including 32 international patents. The company holds multiple international invention patents in countries such as the United States and Germany, establishing a comprehensive global patent protection system.

It has also published 14 academic papers, including 9 indexed by SCI.

Bb061e2babf4d778da01a7ba93da51e3

Hengxiang Hongye has completed more than 1,000 floor and foundation settlement reinforcement, lifting, and leveling projects. It has established extensive cooperation with internationally recognized companies such as Mercedes-Benz, 3M, and Nestlé, as well as leading Chinese enterprises including CATL, Geely, and Haier.

Its overseas business covers multiple countries, providing solutions for foundation settlement challenges worldwide.

VI. Conclusion and Future Outlook

The core challenge of precision lifting in heavy-duty industrial plants lies in satisfying two critical requirements simultaneously: minimizing construction disturbances and maintaining overall structural integrity.

Through the coordinated application of curtain wall isolation, integrated U-shaped underpinning, and segmented precision lifting, this patented technology establishes a mature and standardized solution suitable for various heavy-duty industrial applications, including photovoltaics, metallurgy, and electric power and energy industries.

Looking ahead, as the global new energy industry continues to upgrade and expand, Hengxiang Hongye will continue leveraging its independently developed international patents and extensive engineering experience to provide non-destructive, efficient, and millimeter-level precision foundation lifting and reinforcement services for large industrial plants worldwide.

en.hengxianghongye.com